Up-gradation including Design, Supply, Installation, Testing & Commissioning of the 33/11kV Substation at Mohidana under the Saidpur ESU from 2×10/13.33 MVA to 3×10/13.33 MVA on Turnkey Basis under Power Distribution System Development Project, Rangpur Zone of BPDB
GD 22
Bangladesh Power Development Board
6 July, 2015
Mohidana, Saidpur ESU
Electrical Designing, Civil Designing, Survey and analysis, Layout Design, Procurement, Installation, Testing & commissioning.
33/11kV 20/26.66MVA Transformer, Brand: TBEA, Country of Origin: China
33/0.4kV 200kVA Transformer, Brand: TBEA, Country of Origin: China
33kV GIS Switchgear, Brand: Siemens, Country of Origin: Germany
11kV GIS Switchgear, Brand: Siemens, Country of Origin: Germany
33kV XLPE Cable (Single Core, 500mm2), Brand: ZTT, Country of Origin: China
Key Persons
Abdus Sattar
Project Manager
Shajib Paul
Chief Engineer
Nizam Uddin
Design Manager
Md. Nur E Alam Siddik
Civil Engineer
Sania Sultana
Electrical Engineer
Mahmudur Rahman