Lalbag 33/11kV GIS Substation
Project at a Glance
Project Name

Design, Supply, Erection, Installation, Testing & Commissioning of a new 33/11kV, 2×20/26 MVA (GIS) Sub-Station on Turnkey Basis at Lalbag under the Sales & Distribution Division-1, Rangpur under Power Distribution System Development Project, Rangpur Zone.

Package Number

01

Client

Bangladesh Power Development Board

Starting Date

04th September, 2018.

Project Location

Lalbag, Rangpur.

Major Scopes

Electrical Designing, Civil Designing, Survey and analysis, Layout Design, Procurement, Installation, Testing & commissioning.

Major Equipment

33/11kV 20/26.66MVA Transformer, Brand: TBEA, Country of Origin: China

33/0.4kV 200kVA Transformer, Brand: TBEA, Country of Origin: China

33kV GIS Switchgear, Brand: Siemens, Country of Origin: Germany

11kV GIS Switchgear, Brand: Siemens, Country of Origin: Germany

33kV XLPE Cable (Single Core, 500mm2), Brand: ZTT, Country of Origin: China

Key Persons

Prof. Engr. Sabrina Momtaz, PhD.

Project Manager

Prof. Engr. Abu Zafar, PhD.

Chief Engineer

Engr. Nizam Uddin

Design Manager

Engr. Md. Nure Alam Siddik

Civil Engineer

Engr. Enamul Haque

Electrical Engineer

Engr. Sayed Shatil

Civil Engineer

Project Progress
Design
1 %
procurement
1 %
installation
1 %
testing & commissioning
1 %